1. Create integrated and component drawings in CAD.
2. Complete FEM stress analysis of all components (e.g., wing and fuselage).
3. Complete mock-up and final assessment.
4. Complete advanced CFD analysis.
5. Conduct wind-tunnel model testing and CFD substantiation.
6. Conduct flutter analysis.
7. Conduct extensive and final aircraft and engine performance tests.
8. Create detailed part design and issue manufacturing/production drawings in
CAD. This follows stress analyses of parts.
9. Perform aircraft stability and control analysis and control-surface sizing.
10. Finalize control system design in CAD.
11. Finalize electrical/avionics system design in CAD.
12. Finalize mechanical system design in CAD.
13. Finalize power plant installation design in CAD.
14. Produce jigs and tool design.
15. Plan for subcontracting, if applicable.
16. Place order for bought-out items and start receiving items.
17. Complete cost analysis.
18. Complete design review.
19. Continue customer dialogue and updating (no change in specifications).